Dholera Progress Record

Register 01 / Vol 2026 / Readings through 04.08.2026

Last entry 30.06.2026
Metric / plots-allotted-area

Metric / 8 dated readings

Plots allotted, cumulative area

Plots allotted, cumulative area was recorded at 545 acre in the Delivery Monitoring Unit report as on 30 June 2026, tagged OFFICIAL. The same quantity appears in 8 reports between 30 June 2025 and 30 June 2026. It moved 3 times. Every reading below carries its source file and page.

01

The standing reading

01

545acre

Plots allotted, cumulative area, 30 June 2026, tagged OFFICIAL. Recorded in dmu-latest.pdf, p1.

Source: NICDC/DPIIT 'Proforma for Reporting to the Delivery Monitoring Unit - Industrial Corridor Projects', as-on 30.06.2026. Reference: dmu-latest.pdf, p1. Reading date: 30 June 2026.

02

The series, reading by reading

02
Plots allotted, cumulative area, 8 dated readingsRecorded values between 30 June 2025 and 30 June 2026, in Acre. Every plotted point is a published reading; nothing between two points is interpolated.48050052054056030.06.2531.08.2531.10.2531.01.2630.06.26REPORT DATE (AS ON)ACREPlots allotted, cumulative area, 8 dated readingsRecorded values between 30 June 2025 and 30 June 2026, in Acre. Every plotted point is a published reading; nothing between two points is interpolated.48050052054056030.06.2530.11.2530.06.26REPORT DATE (AS ON)ACRE
Solid brass line and filled squares: readings as published. Points are placed at their true dates, so a wide gap on the horizontal axis is a gap in the reporting, not a slow month.
Plots allotted, cumulative area: 8 dated readings
As onValueUnitAs printed in the sourceTagSource file and pageCK
30.06.2025495Acre495OFFICIALdmu-2025-06-30.pdf, p1
31.08.2025495Acre495OFFICIALdmu-2025-08-31.pdf, p1
30.09.2025495Acre495OFFICIALdmu-2025-09-30.pdf, p1
31.10.2025495Acre495OFFICIALdmu-2025-10-31.pdf, p1
30.11.2025503Acre503OFFICIALdpiit-nicdc-2025-11.pdf, p1
31.01.2026503Acre503OFFICIALdmu.pdf, p1
31.05.2026504Acre504OFFICIALdmu-2026-05-31.pdf, p1
30.06.2026545Acre545OFFICIALdmu-latest.pdf, p1
Standing reading545Acre545OFFICIALdmu-latest.pdf, p1

Sources: dmu-2025-06-30.pdf, dmu-2025-08-31.pdf, dmu-2025-09-30.pdf, dmu-2025-10-31.pdf, dmu-2026-05-31.pdf, dmu-latest.pdf, dmu.pdf, dpiit-nicdc-2025-11.pdf. Readings: 8. Range: 30 June 2025 to 30 June 2026.

03

What is being measured

03

The cumulative area under allotment across every land use, industrial and otherwise. Read against the plot count, it gives the average size of what is being taken up, and read against the industrial line it shows how much of the take-up is industrial rather than commercial or residential.

What this figure does not tell you

Allotted is not built. The reports attach no construction status, no lease date and no consideration to any of this area.

How the source words it

A total of N plots admeasuring X Acre have been allotted in DholeraWording as it appears in the Delivery Monitoring Unit proforma. X and N stand for the printed figures.

Definition written by this register. The quantity, its unit and its date are the source's; the explanation is ours and carries no figures of its own.

04

Movement

04

This quantity changed 3 times across the readings held here. Each row is a change between two consecutive published readings, so the change happened somewhere inside that window and cannot be dated more finely from these sources.

Plots allotted, cumulative area: every recorded change
BetweenFromToChangeUnitSource pages
31.10.2025 to 30.11.2025495503+8Acredmu-2025-10-31.pdf p1 to dpiit-nicdc-2025-11.pdf p1
31.01.2026 to 31.05.2026503504+1Acredmu.pdf p1 to dmu-2026-05-31.pdf p1
31.05.2026 to 30.06.2026504545+41Acredmu-2026-05-31.pdf p1 to dmu-latest.pdf p1

Computed from the dataset by comparing consecutive published readings. Nothing is interpolated between two readings.

05

Related readings

05
Readings that belong beside this one
QuantityLatest valueUnitAs onSource
Plots allotted, count14plots30.06.2026dmu-latest.pdf, p1
Industrial land allotted476Acre30.06.2026dmu-latest.pdf, p1

Latest reading for each related quantity, with its own date and source page.