Metric / ahmedabad-dholera-expressway-lanes

How many lanes is the road from Ahmedabad to Dholera?

How many lanes the road from Ahmedabad has

This page carries the one hard number the monthly reports publish about the road between Ahmedabad and Dholera, which is how many lanes it is designed to carry. There is no published length, cost or opening date for it in these sources, and rather than borrow one from elsewhere this page says so. The answer today is 6 lanes, as at 30 June 2026. It has not changed once in the 8 monthly reports held here, going back to 30 June 2025.

01

The figure, and when it was published

Ahmedabad to Dholera expressway, lane count

6lanes

Published for 30 June 2026 in dmu-latest.pdf, p1. The tag OFFICIAL means this is a figure the source itself prints, not one this site has worked out.

Design specification, not progress. Reports give no km-completed figure for the expressway.

Source: NICDC/DPIIT 'Proforma for Reporting to the Delivery Monitoring Unit - Industrial Corridor Projects', as-on 30.06.2026. Reference: dmu-latest.pdf, p1. Reading date: 30 June 2026.

02

Every published figure, in order

Ahmedabad to Dholera expressway, lane count, 8 dated readingsRecorded values between 30 June 2025 and 30 June 2026, in lanes. Every plotted point is a published reading; nothing between two points is interpolated.55.566.5730.06.2531.08.2531.10.2531.01.2630.06.26REPORT DATELANESAhmedabad to Dholera expressway, lane count, 8 dated readingsRecorded values between 30 June 2025 and 30 June 2026, in lanes. Every plotted point is a published reading; nothing between two points is interpolated.55.566.5730.06.2530.11.2530.06.26REPORT DATELANES
Each square is one published figure and the line simply joins them. Points sit at their true dates, so a wide gap across the page is a gap in the reporting rather than a slow month.

Ahmedabad to Dholera expressway, lane count: 8 dated readings

Ahmedabad to Dholera expressway, lane count: 8 dated readings
As onValueUnitAs printed in the sourceTagSource file and pageCK
30.06.20256lanes6OFFICIALdmu-2025-06-30.pdf, p1
31.08.20256lanes6OFFICIALdmu-2025-08-31.pdf, p1
30.09.20256lanes6OFFICIALdmu-2025-09-30.pdf, p1
31.10.20256lanes6OFFICIALdmu-2025-10-31.pdf, p1
30.11.20256lanes6OFFICIALdpiit-nicdc-2025-11.pdf, p1
31.01.20266lanes6OFFICIALdmu.pdf, p1
31.05.20266lanes6OFFICIALdmu-2026-05-31.pdf, p1
30.06.20266lanes6OFFICIALdmu-latest.pdf, p1
Standing reading6lanes6OFFICIALdmu-latest.pdf, p1

Sources: dmu-2025-06-30.pdf, dmu-2025-08-31.pdf, dmu-2025-09-30.pdf, dmu-2025-10-31.pdf, dmu-2026-05-31.pdf, dmu-latest.pdf, dmu.pdf, dpiit-nicdc-2025-11.pdf. Readings: 8. Range: 30 June 2025 to 30 June 2026.

03

What this figure actually counts

A design specification rather than a progress reading: the number of lanes on the greenfield expressway being built by the national highways authority. It is recorded here because it is the only quantity the Delivery Monitoring Unit reports publish about the road at all, and because a second official source states a different number.

What this figure does not tell you

This is a specification, not progress. No length, no cost and no completion percentage for the expressway appears in these reports.

How the source words it

a N-lane greenfield Expressway connecting Ahmedabad to Dholera is being implemented by NHAIWording as it appears in the Delivery Monitoring Unit proforma. X and N stand for the printed figures.

Definition written by this register. The quantity, its unit and its date are the source's; the explanation is ours and carries no figures of its own.

04

Why it has not changed

This quantity did not change in any of the 8 readings held here, from 30 June 2025 to 30 June 2026. That is a finding rather than an absence of one: the same figure was re-published every time the report was issued. A register records repetition as carefully as it records movement, because a figure that has not moved in a year is the answer to a question people keep asking about this project.

Computed from the dataset by comparing consecutive published readings. Nothing is interpolated between two readings.

05

Figures worth reading beside this one

Readings that belong beside this one

Readings that belong beside this one
QuantityLatest valueUnitAs onSource
Approved tender package value2 784.83INR crore30.06.2026dmu-latest.pdf, p1

Latest reading for each related quantity, with its own date and source page.